Related equipment: Browse our processing equipment.
Major areas of concern for blender maintenance includes the following: installation, alignment and leveling; lubrication; drive alignment; discharge valve; vented covers; intensifier bar assembly; and cleaning of the vessel.
- Installation
- Alignment and leveling: be sure your surface and your trunions are level
- Lubrication
- Main drive reducer should have its oil filled and ready to operate; drain the oil and refill after the first 100 hours; change the oil every 2,500 hours or 6 months
- Pillow block bearings: are grease packed at the factory with NLGI grade #2 lithium base grease
- Trunnion roller assemmbly: maintenance is required if the conditions are dusty, or, if they begin to make noise
- Idle trunnion bearings: no maintenance required under normal circumstances
- Poly cahin drive: requires no lubrication
- Roller chain and sprocket lubrication: correct lubrication is essential to obtain long life of the chain drive: 20 to 40 degrees F = SAE 20 lubricant; 40 to 100 degrees F = SAE 30 lubricant; 100 to 120 degrees F = SAE 40 lubricant; and 120 to 140 degrees F = SAE 50 lubricant
- Maintenance hours
- Motors: inspect at least every 1000 hours; change oil according to the manufacturer’s manual or tag
- Main drive reducer: inspect at least every 500 hours; change oil at least every 2500 hours
- Poly chain drive: inspect at least every 500 hours
- Drive chain and sprocket: inspect at least every 200 hours; change oil every 100 hours, or refer to the maintenance lubrication section of the manual
- Drive gears: inspect at least every 200 hours; grease every 100 hours, or refer to the maintenance lubrication section of the manual
- Pillow block bearings: inspect at lease every 200 hours; grease every 1000 hours
- Rotary union: inspect at least every 200 hours; grease every 200 hours
- V-belts: inspect at least every 100 hours
- Poly chain drive adjustments
- Gates poly chain GT belts: apply the deflection force at the mid span length
- Tension adjustments up to 30 lbs., use Gates’ 30 lb. pencil type tester
- Greater than 30 lbs., use Gates’ 66 lb. double barrel tester
- Discharge valve maintenance
- DO NOT hammer the handle, or use a pipe extension rod
- DO NOT attempt to force the vane parallel with the valve body
- Cover gaskets maintenance
- To maintain a dust-free operation, these units are provided with soft, rubber gasket covers, 50 to 60 durometer, between the cover and the shell
- Periodically check the gaskets for softness, they’ll harden with time
- Replace the gaskets at least once a year
- Avoid cross batch contamination
- DO NOT over tighten the “tee bolt”
- DO NOT use a wrench on the “tee bolt” to gain additional leverage
- Over tightening may cause severe damage to the covers
- Blenders with vented covers
- Filter media should be considered expendable
- Easy access filters when they become plugged with material, or excessively damp, they should be replaced with clean ,new, dry “easy access” filters
- Intensifier assembly
- Routine maintenance should include the flanged cartridge assembly, O-ring, and high speed intensifier bar
- Flanged cartridge and air seals
- Routine maintenance should include tamper roller bearings, v-ring seal, cartridge air seal housing, cartridge air seal distributor, ring seal, and oil seal
- Intensifier drive end assembly with flanged cartridge and packed seals
- Routine maintenance should include checking the flanged cartridge assembly, O-ring, pin intensifier, tamper roller bearings, cartridge packaging housing, oil seal and ring seal
- Double hung intensifier bar intensifier drive end assembly
- Routine maintenance should include checking the v-ring seal, felt packaging rings, oil seal, Timken bearing cup/cone, Timken lockwasher, Timken locknut, intensifier drive shaft, oil seal, and o-ring
- V-Ring setup detail drive end
- Routine maintenance should include checking the seal housing cover, gauge block, seal collar, v-ring seal
- Double supported intensifier bar intensifier idel end assembly
- Routine maintenance should include checking the v-ring seal, and felt packing rings
- V-ring setup detail idle end
- Routine maintenance should include checking the v-ring seal, seal collar, and gauge block
- Vessel Cleaning
- Detergent, fill the vessel 1/3 with water, with or without detergent
- Close all access covers, and rotate vessel
- Drain and rinse if required
- Remove and clean cover seals