Skip to content

Maintenance & troubleshooting guide

Pharmaceutical Packaging Line Maintenance Tips

Browse the library

Related equipment: Browse our complete packaging lines.

Maintenance is not only a set of specific functions to help you keep your line in good running condition, it also helps you to maximize output, keep regulatory at bay, identify planable costs, keep production reliable, minimize downtime, and help you keep product quality at a high level.

  • Mainetnance: involves all activities needed to keep, or, to reach your targeted condition(s)
  • In addition, it helps you realize and judge the present condition(s) within a respective time frame
  • Preventive mainetnance: anticipates malfunctions before they casue a breakdown
  • It’s a stratety which considers maintenance aspects already in the design, assembling and installation phase in order to achieve “minimum necessary maintenance”
  • Planning phase considerations: packaging materials, parts, tools, storage, handling, transportation, equipment, personnel, training, etc…
  • Technical documentation: make sure that regulatory is involved in the planning phase
  • Scheduling considerations: changeovers, cleaning, preventive maintenance, corrective maintenance, continuous improvement, etc…
  • Transparency: ensure that the process is transparent and there is a flow of needed information to all the principals involved
  • Leadership: identifies all the principals involved and defines their roles
  • Cooridnates the planning and project budgeting
  • Planning and scheduling: it’s the hub of the maintenance organization
  • Involved are operations, supervision, accounting, inspection, storage, technical data base development and management, and anyone else you think should participate
  • Planning is the what you are to do, and the how you are to do it
  • Scheduling is when the task is supposed to be done, and who is to perform the task
  • Common mistake is that many people leave out the planning portion of the maintenance function
  • Planning involves machinery/equipment, station(s), change parts, essential care, parts, materials, permits, tools, skill sets, etc…
  • Scheduling involves production, maintenance department, service engineering, etc…
  • Maintenance is performed according to the maintenance plan without interpretation/variation
  • Training and qualification: ideally, you want your personnel to be able to perform a number of tasks
  • Training, a sound training program is always a benefit; keep personnel updated with the latest advancements
  • Qualification basics: machine operator must be competent in machine operation; they should be able to address any format changes; knowledgeable in the basic maintenance needs of their machine; be able to troubleshoot basic problems; and be able to competently train other personnel
  • Production planning: should always include maintenance planning and they should always “work together”, productivity will increase, and it’s not only about the machinery
  • Good maintenance practices: include corrective and preventive maintenance, and contiuous improvement
  • Corrective maintenance should either be planned and/or scheduled
  • Preventive maintenance should include essential care, condition monitoring, and fixed time maintenance
  • Continuous improvement includes design for reliability, design for maintenance, improving procedures, and performance monitoring
  • Good maintenance mix: includes a number of different strategies for your equipment and line
  • Operative strategy: includes non-critical parts or functions; doesn’t influence other functions; parts and stations are in stock, or can be available in a short period of time
  • Preventive strategy breakdowns are an unnecessary cost; good for more complex equipment; breakdowns may involve environmental or safety risks; includes equipment that has a well documented breakdown history; it’s production hour dependent
  • Inspection strategy includes breakdowns that are not predictable; condition(s) that can be detected; maintenance depends on the condition of the part; requires regular inspection; development of a method that identifies wear; unnecessary maintenance can be avoided; the process can be easily determined
  • Strategy mix includes: 20% operative, 10% preventive, and 70% inspection; the mix is flexible according to your needs and specific situation
  • First step is to define which part/station will be maintained with which strategy
  • Maintenance process is streamlined to productivity, and the center of that process is your “personnel”
  • Personnel, you want that person to be self-maintaining (my machine, my area, maintenance is part of production, I am qualified); you not only want them to take pride in their job, but you want them to be qualified and competent
  • Establish an individual improvement program
  • Encourage active participation of employees in the improvement process
  • Changeover considerations: performance of a changeover is dependent upon a number of variables
  • Equipment: does it have a central tool locking system; format change procedures; individual program format?
  • Settings, are they in a reproduceable format?
  • Validation, how will that impact the process?
  • Calibration: the process relevant parameters of the packaging machine should be calibrated
  • Following should be calibrated: machine speed; forming air pressure; cooling water temperature; tolerance of sealing tools; temperature distribution of the sealing tools; pressure nuts; temperature of the heating elements; or, anything else you can think of?
  • GMP Cleaning: “avoid all affects which can have influence on the product in order to reduce the risk for the patients through poor quality or effectiveness”
  • FDA: equipment and utensils shall be cleaned; written procedures shall be established
  • Cleaning: make sure all pertinent personnel know their assignment and responsibilities for cleaning; know maintenance and cleaning schedules; describe in sufficient detail the methods, equpment, and materials that are relevant to that cleaning procedure; protect clean equipment from contamination; inspect equipment for cleanliness before using; keep impecable records for maintenance, cleaning, sanitizing and inspection
  • Microbiological: try to avoid and eliminate microbiological contamination, document all incidences
  • Mix-ups: prevent in packaging and labeling operations; a major area for recalls
  • Equipment cleaning: use a log, a written record of major equipment cleaning, maintenance, etc.; according to the FDA, “if it’s not documented, it’s not done”
  • Line cleaning validation includes: components “in” contact with the product; and components “not” in contact with the product
  • Components “in” product contact: feeding system, thermoforming machine
  • Components “not” in product contact: cartoning, stretch banding machine, and casepacker; finally, visual cleanliness
  • Cleaning procedure recommendations: create individual cleaning validation scenarios for all kinds of possible changeovers; have backup parts for product contact parts and feed system parts; make sure your personnel are well trained in the cleaning, operating and maintenance of your equipment